Sign In | Join Free | My uabig.com
China Qingdao KXD Steel Structure Co., Ltd logo
Qingdao KXD Steel Structure Co., Ltd
Verified Supplier

1 Years

Home > Steel Structure Building >

Turnkey Pre-engineered steel structure building solution for you

Qingdao KXD Steel Structure Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Turnkey Pre-engineered steel structure building solution for you

Brand Name : KXD

Model Number : S-0071

Certification : CE, ISO, SGS

Place of Origin : Qingdao, China

MOQ : 500 square meters

Price : US$ 50-80 per square meter

Payment Terms : L/C,T/T

Supply Ability : 3000 tons per month

Delivery Time : 30-40 working days

Packaging Details : bulk for steel panels, steel pallet for steel structure, wooden box for small installing accessories

Installation : Free Installing drawing details & Quick on-line technical guide

Prefabrication : Off-site in workshop & Ready for direct installation

Connection : High Strength Bolt connected

Visit : Workshop Visit And Quality Check

Turnkey Project : Acceptable

Design : Custom with Free Architectural design

Dimensions : Customers' Requirement

Door : Sliding door or rolling up door

Color : Client's Request

Surface : Hot-dip Galvanized / Painted

Frame : Steel structure

Lifetime : over 50 years

Structure Type : High Strength Steel Structure Frame

Third Party Test : SGS, BV, ITS

Contact Now

Steel Structure Features:

Steel has a high strength-to-weight ratio, which is very strong for its weight, and is much higher than other common construction materials, such as concrete and wood. This means that steel components can be made very lightweight without sacrificing strength.

Ductile steel structures can absorb more energy before failure than brittle structures. This makes them ideal for applications subjected to high-impact loads, such as in earthquake-prone areas or industrial settings.

High Strength

Engineered to support colossal weights, guaranteeing unwavering structural stability.

Durability

Built to endure, our structures boast an impressive lifespan, withstanding wear and tear over time.

Lightweight

Facilitates effortless transportation and swift installation.

Quick Assembly

Prefabricated components are meticulously crafted for rapid construction and seamless assembly.

Large span

Effortlessly bridges expansive spaces, minimizing the necessity for multiple interim support structures.

Versatility

Perfectly adaptable, catering to a rich variety of architectural blueprints.

Cost-Effective

Contributes to substantial savings in both long-term maintenance and upfront construction costs.

Eco-Friendly

Constructed from recyclable steel, our products champion environmental sustainability and reduced ecological impact.

Processing Steps of Prefabricated Steel Structure Buildings:

Planning and Design

Prefabricated steel buildings starts with a detailed planning and design phase. During this stage, the project’s requirements are identified, and the building’s specifications are established. Factors such as size, layout, and intended usage are considered to ensure that the final design meets the client’s needs. The planning phase also includes obtaining necessary permits and approvals, as local regulations may impact the building’s design.

Turnkey Pre-engineered steel structure building solution for you

Fabrication in the workshop

Once the design is finalized, the components are manufactured in a factory. The use of advanced technology in the manufacturing process ensures that the components are of high quality and precisely engineered for quick assembly.

Turnkey Pre-engineered steel structure building solution for you

On-Site Assembly

After the prefabricated components are transported to the site, the assembly process begins. Since the parts are pre-engineered, they fit together seamlessly, making the installation process much faster than traditional construction methods. A skilled team of workers assembles the steel frame, attaches the wall panels, and installs the roofing system. Depending on the size and complexity of the building, the assembly process can take anywhere from a few days to a few weeks.

Turnkey Pre-engineered steel structure building solution for you

Steel Structure Building Installation steps:

1.Foundation construction (pre-embedded anchor bolts),

Installing detailed drawing will be offered in advance.

2. Column installation

One worker commands truck crane how to move, 3 ~ 4 workers cooperate with crane to install the steel column, put column to anchor bolt location.

3.Beam installation

After completing the installation of adjacent two steel column, then main beam begin to install.

4.Installing roof & wall purlin

The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure.

5.Fixing wall and roof sheet

To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet.

6.Fixing the cover

To install the cover on the corner, eave, window and door opening.

7.Install windows and doors.

KXD Install Service:

We will offer detailed drawings to guide your installing process. Meanwhile, we still offer free technical questions solve in time. And further we offer different plans to choose for different demands.

On-line technical guide in time;

1-2 engineers to guide on site;

Our installing team process all assemble for the client.



Wholesale Turnkey Pre-engineered steel structure building solution for you from china suppliers

Turnkey Pre-engineered steel structure building solution for you Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao KXD Steel Structure Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)